Sunday, April 26, 2009

Day #1: Casebuilding



1 unit of base case parts, cut.

A full day wound up with the parts for the base of the case unit cut and finished to the correct sizes. I managed to cut the holes for the buttons on the lower panel (leaving the upper control panel until next week) however basically all the rest has been done by a professional carpenter.

This base part will need some holes cut for ventalation, side buttons (for pinball), piano hinge on the base for fold-out access, and finially assembly. Then its onto construction of the top part.

Im anticipating at least another two full days of work until the woodworking is done. Then its onto painting.

No comments:

Post a Comment